Haverhill Fencers installs timber decking for homeowners in Glemsford - and if you are waiting for a contractor to start work, there are useful things you can do beforehand and a few things that are best left alone.
Building a deck means more than fixing boards to a frame. The groundwork comes first: clearing the area, managing any slope or drainage issue, setting pad foundations and constructing a pressure-treated subframe that carries the load evenly. The decking boards go down last. A deck built on correctly spaced, properly treated framing with good ventilation underneath will stay solid for many years. One built on inadequate foundations or with undersized joists will start to move and rot within a few seasons.
We work with treated softwood for most residential decks, which handles the UK climate well when the correct treatment class is used. We also offer hardwood options for customers who want a different look or a different surface character. Split-level and raised structures are just as achievable as simple ground-level platforms, provided the structural specification reflects the extra height and loading.
There is often a gap between agreeing a job and the start date. That gap is not dead time - there are several things a homeowner can do in advance that make the installation go more smoothly and can save time on the day.
Remove any garden furniture, plant pots, ornaments or stored items from the area where the deck will go. If there is existing decking to come out, the contractor will handle that, but removing clutter around the space speeds up both the survey and the job itself. If there are large pots that need two people to shift, do that before the team arrives rather than on the day.
Decking materials arrive as lengths of timber, and a standard bearer or joist can be 3.6 metres or longer. Think about how they will get from the delivery point or van to the garden. If the only route is through the house, clear a path through. If access is through a gate, measure the width and let the contractor know in advance if it is narrow. Restricted access does not stop a job, but knowing about it beforehand means materials can be cut to manageable lengths off site rather than causing problems on the day.
Decking foundations involve digging or driving fixings into the ground. If you know where drainage runs, inspection covers, soakaways or irrigation pipes are located in the area, make a note or mark them roughly before the contractor arrives. Most experienced contractors will probe and check before breaking ground, but your local knowledge of what has been done in the garden is genuinely useful and prevents accidental damage.
Steps, balustrades and fascia boards are often decisions that get left until the last moment and then slow things down. If you know you want steps in a particular position, or a specific balustrade style, have that conversation with the contractor before work starts - not while the frame is going up. Changing the position of steps after the frame is built is possible but means rework. Deciding in advance costs nothing.
Decking boards are usually supplied in a sawn or smooth profile. Grooved boards drain better and are less slippery in wet conditions. If you have children or older adults using the deck regularly, the board profile is worth thinking about before the order is placed, not after. The same applies to colour: if you plan to stain the deck, some species take stain better than others, and it is worth discussing this before the timber is ordered.
There is a temptation to get ahead of things yourself, and some preparation is genuinely helpful. But a few common DIY moves in the days before a decking job create more work, not less.
Pad foundations for decking need to be positioned precisely to support the frame at the right points. If you pour concrete in advance without knowing where the bearers will run, there is a good chance the pads end up in the wrong place and need to be broken out. Leave the groundwork to the contractor.
If there are tree roots running through the area where the deck will go, mention it to the contractor. Hacking through a large root with a mattock or chainsaw without knowing what it connects to can damage a healthy tree significantly. A contractor can assess whether roots need clearing and how to do it without unnecessary damage.
Weedkiller does not replace a weed membrane. A proper membrane laid under the deck frame stops vegetation growing up through the structure for years. Weedkiller keeps the surface clear for weeks at most. Leave the ground preparation to be done as part of the installation.
It is tempting to save money by sourcing decking boards from a builders' merchant before the contractor arrives. The problem is that board thickness, width and treatment class need to match the specification the contractor is building to. Boards that are slightly under-sized or incorrectly treated create problems that are difficult to resolve once the frame is already built. Buy materials through or with the contractor, or confirm the exact spec before ordering anything independently.
Knowing what to expect makes the day less disruptive. The first stage is usually ground preparation - clearing, levelling and laying the membrane. Foundations go in next, then the frame, then the boards. Depending on the size of the deck and the complexity of the design, a ground-level platform can often be completed in one or two days. Raised or split-level decks take longer, particularly if there is significant groundwork involved.
Expect noise, some mess around the work area and a need to keep children and pets away from the site while work is in progress. A good contractor will leave the area tidy at the end of each working day if the job runs over.
New timber will often look pale and slightly rough for the first few weeks as the surface dries out fully. This is normal. Allow the deck to dry before applying any oil or stain, particularly if it has been delivered recently or if it rained during installation. New treated softwood can take several weeks to reach a moisture content low enough for a surface treatment to bond properly - your contractor can advise on timing for your specific timber.
Haverhill Fencers covers Glemsford and the surrounding area from our base in Haverhill. If you are planning a new deck and want to talk through the design, the materials and what to expect from the process, call us to arrange a visit.
Also available
New fence installation in Haverhill and the surrounding villages, from garden boundaries and close-board panels to security and rural post-and-rail.
See detailsDamaged fence panels, leaning posts or broken rails don't just look untidy - they leave your property unsecured.
See detailsNew gates installed for driveways, side entrances and garden boundaries across Haverhill.
See detailsCall and speak to the person who will do the work, or send the form and we will come and measure up.