A new fence installed in Long Melford is an investment worth protecting - and the right aftercare from year one is what separates a fence that lasts twenty years from one that needs replacing in ten.
Haverhill Fencers, based in Haverhill, install timber panel, close-board, picket and post-and-rail fencing across Long Melford and the surrounding area. Every job starts with the groundwork: posts dug to the correct depth, set in concrete, and given time to cure before rails and boards are fixed. We use pressure-treated timber throughout because treatment is not an optional extra - it is what gives the fence its working life.
A properly installed close-board fence on pressure-treated posts, with concrete gravel boards at the base, can realistically last fifteen to twenty-five years with straightforward maintenance. Cut that number roughly in half if the groundwork or materials are poor and no maintenance is done.
New timber moves as it dries out. Pressure-treated timber arrives wet from the treatment process and will shrink slightly as it loses moisture over the first season. Small gaps appearing between feather-edge boards or minor checking (hairline cracks along the grain) are normal and not a sign of a problem. Structural cracking or splitting in posts or rails is different and worth reporting.
Do not apply any paint, stain or preservative to new pressure-treated timber in the first year. The wood is still releasing moisture and a surface treatment applied too soon will not bond properly and may peel. Wait until the timber has had a full summer to dry before applying anything.
After the first year, applying a timber preservative or fence stain every two to three years is the single most effective maintenance step you can take. It slows moisture penetration, reduces the movement that causes boards to split, and keeps surface mould and algae from taking hold.
The best time to treat is late spring or early summer when the timber has dried out after winter but before the hottest, driest weather sets in. Apply to dry timber only - treating damp wood traps moisture beneath the surface coating. Clean the fence down first with a stiff brush to remove loose dirt, algae and any flaking old stain.
A quick visual check once or twice a year takes very little time and catches problems before they become expensive. The most useful things to look at are the areas where timber meets the ground or collects standing water.
Plants growing against or over a fence are one of the most common reasons timber fails faster than it should. Ivy and other climbers hold moisture against the timber surface continuously, preventing it from drying out between wet spells. Dense planting right up to the fence base does the same thing at post level.
Keep climbers trimmed back from the fence face. If you want plants against the fence, a trellis fixed off the fence face by 50mm or so gives the plant something to grow on while allowing air to circulate behind it. Keep a clear strip of ground at the base of each post so the immediate area can dry out after rain.
After significant wind, walk the fence line and check each post for movement. Push firmly at the top of each post and watch the base. Any visible rocking means the post has shifted in its concrete or the concrete has cracked - this needs attention before the next storm, not after it. A post that has moved will transfer stress to the rails and panels and can cause a section to collapse.
Check panel clips and fixings after storms too. On timber panel fencing, panels held only by clips can be pulled free even when the posts are undamaged. Re-securing a panel that has come free is a straightforward job; replacing it after it has blown over and broken is more expensive.
Supply and installation of close-board fencing near Long Melford typically costs from around £80 to £130 per metre, depending on ground conditions, access and post-fixing method. Timber panel fencing falls in a broadly similar range. Post-and-rail fencing for an open garden or paddock boundary generally runs from £30 to £60 per metre for a two- or three-rail run.
Adding concrete gravel boards to a new close-board or panel fence adds to the upfront cost but reduces long-term maintenance significantly - it is generally worth doing if your budget allows.
We install and repair fencing across Long Melford, Glemsford, Clare, Kedington and Steeple Bumpstead, and throughout the wider area around Haverhill. If you have a new fence coming up or want advice on getting more life from an existing one, call us to arrange a visit to your site in Long Melford.
Also available
Damaged fence panels, leaning posts or broken rails don't just look untidy - they leave your property unsecured.
See detailsNew gates installed for driveways, side entrances and garden boundaries across Haverhill.
See detailsHaverhill Fencers installs timber, composite and hardwood decking for gardens of all sizes.
See detailsCall and speak to the person who will do the work, or send the form and we will come and measure up.