Haverhill Fencers install timber decking in Fulbourn gardens, and this page walks you through every stage of the process so you know exactly what is involved before any work begins.
A decking installation is not a single task - it is a sequence of steps where each one depends on the last being done correctly. Understanding what those steps are helps you ask the right questions, spot shortcuts being taken and set realistic expectations about how long the work takes. We go through the stages below as they happen on a typical residential job.
Before any materials are ordered or a price is agreed, the site needs to be looked at properly. That means checking the ground condition where the deck will sit, the level difference between the garden and any door or threshold the deck needs to meet, how drainage runs across the area and whether there are any services - water pipes, gas lines, electricity cables - that need to be located before any digging happens.
For gardens in Fulbourn as elsewhere, ground that appears flat is rarely perfectly level. A proper assessment involves taking levels across the whole footprint of the proposed deck so that the design can account for any slope. A deck that is built without doing this ends up with variable post heights that were not planned for, which adds time and cost mid-job.
This is also the stage for confirming dimensions and agreeing on the design. Will the deck be ground-level or raised? Does it need steps? Are there planters, a gate or a balustrade in the plan? Settling these questions before work starts avoids changes once the frame is in the ground.
Once the design is confirmed, the ground preparation begins. For a ground-level deck, this usually means clearing the area of turf and vegetation and laying a weed-suppressing membrane to stop growth coming up between and under the boards later. For a raised deck, it means marking out post positions and either digging post holes or positioning post bases.
Post holes for a raised deck are typically 300 to 450 mm deep depending on the height and loading of the structure. Each hole is filled with concrete and the post allowed to cure before load is applied. Rushing this stage - setting posts and immediately loading them before the concrete has gone off - is a false economy that leads to posts shifting before the frame is even complete.
If the deck sits on an existing paved or concrete surface, bolt-down post bases are often used instead of dug holes. These need the base surface to be structurally sound. Loose, cracked or hollow slabs need to be addressed before the bases go down.
The subframe is the structural core of the deck. It consists of bearers (the main horizontal beams spanning between posts or sitting on the ground), joists (the secondary beams the boards rest on) and all the metal fixings holding the frame together. This is the stage that determines how the finished deck feels underfoot and how long it holds its shape.
Joist spacing is set out and marked before any timber is cut. For most standard decking board profiles, 400 mm centre-to-centre spacing is correct. Boards that are designed for 400 mm spacing will flex noticeably if the joists end up at 500 or 600 mm. Each joist is checked for level as it goes in - a frame that is out of level by even a few millimetres will make the finished surface look uneven and can cause water to pool.
All structural connections use joist hangers or post-to-bearer brackets rather than just nails or screws through timber. Metal connectors are stronger, more consistent and far less likely to work loose over time. Fixings throughout should be stainless steel or A4-rated to resist corrosion in outdoor conditions.
Once the frame is level and complete, the surface boards go down. The first board is set square to the frame and secured, then subsequent boards are gapped and fixed across the full width of the deck. The gap between boards - typically 5 to 8 mm - allows rainwater to drain through and allows for the natural expansion and contraction of the timber as moisture content changes through the seasons.
Boards are fixed either through the face with screws or with hidden clips that engage a groove routed along the board edge. Face-fixed boards are quicker to install; hidden fixing systems take longer but leave no screw heads on the surface. At the end of each board run, boards are trimmed to a consistent overhang at the perimeter - usually 25 to 30 mm beyond the outer joist - giving a clean, even edge.
If the deck design includes steps, those are built at this stage too. Step stringers are cut from structural timber and fixed back to the main frame, with treads laid and secured the same way as the main deck surface.
Where the deck sits more than 600 mm above ground, a balustrade is required. Posts for the balustrade are either bolted to the outer joists of the frame or, more solidly, fixed to the main structural posts before the decking boards go down. Rails and infill panels - timber, metal or glass - are fitted between the posts. Building regulations in England require balustrades on accessible decks above 600 mm to be at least 1,100 mm high and to be designed so that a 100 mm sphere cannot pass through any gap in the infill.
Fascia boards are fitted to the outer faces of the frame to conceal the structural joists and give the deck a finished edge. These are cosmetic but they also help protect the end grain of the joists from direct rain. Skirting beneath a raised deck stops animals nesting underneath and gives the structure a cleaner look from the garden.
A finished deck should be swept clear of all offcuts, packaging and debris before the installer leaves. The surface boards should be checked for any fixings that have not been fully driven home and for any sharp arris edges on the board ends that could catch bare feet.
The final check should also include walking the deck deliberately - across it, along it and at the corners - to confirm there are no boards that flex more than the rest, no fixings that squeak and no areas where the surface is out of true. A good installer will do this as a matter of course before the job is signed off.
Freshly installed pressure-treated softwood will need its first oil or stain treatment after the timber has had time to dry out - typically three to six months after installation. Treating boards while they still hold construction moisture traps that moisture in rather than sealing the surface.
When comparing quotes for decking installation in Fulbourn, ask specifically about joist spacing, fixing specification and treatment class of the structural timber. Ask whether the price includes ground preparation, disposal of excavated material and all fixings, or whether those are extras. These details make a significant difference to the final cost and to the quality of what is built.
Call Haverhill Fencers to arrange a site visit and we will walk through the process with you for your specific garden before any commitment is made.
Also available
New fence installation in Haverhill and the surrounding villages, from garden boundaries and close-board panels to security and rural post-and-rail.
See detailsDamaged fence panels, leaning posts or broken rails don't just look untidy - they leave your property unsecured.
See detailsNew gates installed for driveways, side entrances and garden boundaries across Haverhill.
See detailsCall and speak to the person who will do the work, or send the form and we will come and measure up.