Haverhill Fencers installs and dismantles timber site hoarding in Fulbourn, managing the whole process from initial site assessment through to final clean-up once your project is complete.
Site hoarding is more involved than dropping off a stack of panels. A properly managed installation follows a clear sequence of steps, each of which affects how safe, compliant, and durable the finished hoarding will be. Understanding what should happen at each stage helps you hold any contractor to account and spot where corners are being cut.
Here is the process we follow for hoarding installations in Fulbourn and across the surrounding area.
Before any materials are ordered or a price confirmed, the site needs to be seen. A visit covers several things that cannot be established from a plan or a phone call alone:
Skipping the site visit and pricing from a rough description is how jobs end up with materials ordered to the wrong lengths or posts that cannot be driven into unexpected concrete below ground.
Once the site has been assessed, the specification is confirmed. This includes panel height (typically 2.4 metres, though 3.0 metres or taller may be required), panel facing material, post and fixing method, gate sizes and positions, and any additional requirements such as signage panels or a pedestrian canopy over a footpath.
If the project has a principal contractor or planning officer involved, their requirements take precedence and the specification should match whatever has been agreed with them. It is worth asking for any conditions in writing before the installation is booked, since changing the specification after panels are up can be costly.
Timber panels are fabricated either off site or in sections that are assembled on arrival. On sites in and around Fulbourn, access for a flatbed or curtain-side delivery vehicle is usually straightforward, but tight access or restricted parking needs to be flagged in advance so materials can be staged appropriately.
Before posts go in, any surface preparation is carried out. This might include marking out post positions, checking for services using drawings or a cable avoidance tool, and clearing vegetation or debris along the line of the hoarding. On surfaces where posts cannot be driven or concreted in, kentledge bases are positioned and ballasted.
Posts are the foundation of any hoarding run. The installation method depends on the ground. Driven timber posts work well in firm soil or grass. On hard standings such as concrete or tarmac, posts are set into core-drilled sockets and packed with fast-setting concrete, or kentledge weighted feet are used if breaking the surface is not permitted.
Post centres are typically 1.8 metres to 2.4 metres apart, depending on the panel design and wind exposure. Posts must be plumb and set to a consistent height so that the hoarding runs level along the top. Getting this right at the post stage saves a great deal of remedial work when panels go on.
Panels are fixed to the posts and braced to resist wind loading. Bracing is typically added as diagonal knee braces or horizontal rails on the inside face of the run. The amount of bracing required depends on panel height: taller panels in exposed positions need more bracing than a standard 2.4-metre run in a sheltered yard.
All joints between panels are closed off so there are no gaps at ground level or between adjacent panels. Any gap wide enough to allow a hand or a lever to be inserted is a security risk and a compliance failure. The inside face of the run is accessible to site workers but should not have exposed screw heads or sharp edges at head height.
Gates are hung onto posts or frames that have been purpose-built to carry the extra weight and movement load. A double-leaf vehicle gate of 3.0 to 4.0 metres typically requires heavier posts than the standard panel run, with a concrete foundation beneath each gate post.
Hardware is fitted and tested: hinges, drop bolts, lock, and any automatic closing mechanism if required. Gates should swing freely without dragging on the ground, close flush without forcing, and lock securely with a single action. A gate that requires two people to close is one that will routinely be left open.
Once the installation is complete, a walk-round of the full perimeter is carried out. The checklist covers panel plumb and alignment, gaps at ground level, gate operation, lock function, bracing integrity, and any signage or information boards required by the site or planning condition.
Any remedial items are dealt with before the site team takes possession. The person responsible for the site should walk the hoarding with the installation team at handover, not inspect it alone after they have left.
At the end of the project, hoarding is dismantled in reverse order. Posts are pulled or the concrete broken out, any surface reinstatement is carried out, and all materials are removed from site. Panels in good condition can be cleaned and reused; damaged material is disposed of.
Dismantling should be agreed and scheduled in advance. Leaving hoarding in place beyond the end of a project creates unnecessary obstruction and, on a highway licence, can attract penalty charges from the authority. Book the dismantle date when you book the installation so it is in the programme from the start.
Haverhill Fencers installs and dismantles hoarding in Fulbourn and at sites across the wider area from our Haverhill base, including neighbouring communities. Call us to discuss your project and arrange a site visit at a time that suits you.
Also available
New fence installation in Haverhill and the surrounding villages, from garden boundaries and close-board panels to security and rural post-and-rail.
See detailsDamaged fence panels, leaning posts or broken rails don't just look untidy - they leave your property unsecured.
See detailsNew gates installed for driveways, side entrances and garden boundaries across Haverhill.
See detailsCall and speak to the person who will do the work, or send the form and we will come and measure up.