If you want to know exactly what happens when Haverhill Fencers installs a gate at your Newmarket property, here is the job from first look to clean-up - no vague promises, just the actual process.
Every gate installation starts with understanding what is already there. Before any gate is measured up or any material is ordered, the opening needs to be assessed properly. That means measuring the gap at the top and at the bottom - not just once across the middle. If those two measurements differ by more than about 20mm, the existing posts have already moved, which changes the plan significantly.
The condition of the existing posts matters as much as the measurements. If the posts are solid, plumb and set in good concrete, a new gate can sometimes be hung on them directly. If they have any movement, they need replacing - hanging a new gate on failing posts is the fastest way to create the same problem again within a year. Pressing a penknife blade into the base of a timber post tells you quickly whether rot has got into the wood below ground level.
The surface the gate will sit on is also checked at this stage. A gate that swings over a level path is straightforward. A gate over a sloping drive or uneven ground needs its arc planned carefully so it does not catch as it opens. Getting this wrong means the gate has to be lifted over the high point every time it is used - frustrating very quickly.
Once the opening is understood, the gate type and size are agreed. For a pedestrian side gate, the standard width is 900mm to 1 metre. Driveway gates run wider - typically 2.4 metres to 4 metres for a single leaf, more for a pair. Height is usually 1.8 metres for a residential boundary, though taller gates are possible where privacy or security is the priority.
At this stage, the hardware is specified too. Hinge size and type depend on the gate's weight. A light timber garden gate takes a pair of standard heavy-duty strap hinges; a solid hardwood driveway gate of any significant width needs butt hinges or weld-on hinges sized to carry the load without flexing. Getting the hinge specification wrong is one of the most common causes of early gate failure - undersized hinges bend, which puts stress on the post fixings and starts the cycle of dropping and sticking.
If new posts are needed - which is the case for most new installations and many replacements - this is where the groundwork happens. Post holes are dug by hand or with an auger, depending on access and ground conditions. Depth matters: a post for a pedestrian gate should go down at least 600mm; a post for a heavier driveway gate should go to 900mm or deeper. Anything less and the post has insufficient anchorage in clay or sandy soils that shift with moisture.
Concrete is mixed and poured around the post, usually with a slight crown above ground level so rainwater sheds away from the post base rather than pooling against it. Timber posts should be the preservative-treated variety and positioned so the treated section extends into the concrete rather than leaving untreated wood at ground level where moisture collects. Posts are checked for plumb in both directions before the concrete is left to set.
The concrete needs time to cure before the gate is hung. In normal conditions that is at least 24 hours, longer in cold weather. Hanging the gate too early - while the concrete is still green - risks pulling the post out of plumb the moment the gate's weight is applied. This is a stage where patience matters.
With the posts set and cured, the gate is offered up into the opening and the hinge positions are marked. For a timber gate, hinges are fixed through the gate rail with coach bolts rather than screws wherever possible - screws are adequate for light gates, but coach bolts with a nut and washer on the back face resist the rocking motion that loosens fixings over time. The hinges are also fixed to the post with coach bolts through the full post width on a timber installation.
The gate is hung and checked through its full arc. It should swing freely in both directions without lifting at the hinge or dragging at the base. If the ground slopes under the arc, the swing is adjusted to clear the high point while keeping the gap at the base to a minimum for security and appearance. A 50mm gap under the bottom rail is about the practical minimum for ground clearance without letting animals or small children through easily.
Metal gates on weld-on hinges follow the same principle, but the hinge is welded to the post plate and the gate leaf in the fabrication stage, then the post plate is bolted to a steel or concrete post on site. The critical check is that the two hinge points are precisely aligned vertically - if they are even a few millimetres out of line, the gate will bind at one point in its arc.
The latch is fitted after the gate is confirmed plumb and swinging correctly. A rising bar latch or a ring latch suits most pedestrian garden gates. For a side gate where security is the priority, a bolt that operates from the inside only - out of reach over or under the gate - is the right choice. For driveway gates, a ground bolt dropped into a socket in the path holds the passive leaf of a pair while the other is opened; without this, both leaves tend to swing in wind even when the main lock is engaged.
If the brief includes a lock, this is fitted and tested at this stage. The keep - the plate or socket the latch or bolt engages with - is aligned carefully so the gate does not have to be pushed hard to latch, but also does not rattle loose when latched. A keep that is too far from the latch point means the gate never feels properly closed.
Before leaving the job, a proper check covers all of the following:
If the gate is automated, the travel limits are set so the motor stops before the gate hits the end stop under its own force, and the safety edges - the pressure sensors that stop and reverse the gate if it meets resistance - are tested with an object placed in the path of the closing gate.
Concrete spoil, packaging, any removed old posts or old gates - all of this leaves the site. The area around the new posts is made good, whether that means replacing a section of gravel, tamping down disturbed soil or cutting back turf that was lifted for the post holes.
At handover, the latch and any lock operation is demonstrated, and the maintenance requirements of the gate material are explained - how often the timber should be treated, which parts to oil annually, what signs to watch for that suggest a hinge is working loose. A gate that is serviced at sensible intervals will stay in good condition for many years.
We carry out gate installations across Newmarket, working from our base in Haverhill. Whether it is a single side gate or a pair of driveway gates, the process is the same: assess the opening honestly, set the posts to the right depth, hang the gate with hardware sized for the weight, and check everything before we leave. If you want to discuss a gate for your property, call us and describe the opening - we will tell you what the job involves and what to expect.
Also available
New fence installation in Haverhill and the surrounding villages, from garden boundaries and close-board panels to security and rural post-and-rail.
See detailsDamaged fence panels, leaning posts or broken rails don't just look untidy - they leave your property unsecured.
See detailsHaverhill Fencers installs timber, composite and hardwood decking for gardens of all sizes.
See detailsCall and speak to the person who will do the work, or send the form and we will come and measure up.